Lightning protection system at CKU Koszalin
Complete replacement of the lightning protection system at the Continuing Education Centre in Koszalin.
Browse our selected projects in electrical installations, alarm systems and smart home solutions.

Dla SunRoof Technology wykonaliśmy część instalacji odgromowej domu w Charzynie. Moduły fotowoltaiczne tworzą połać dachu, dlatego przebieg zwodów dopasowaliśmy do pokrycia. Zamontowaliśmy czarny drut odgromowy na czarnych uchwytach wzdłuż kalenicy i krawędzi szczytowych, wykonaliśmy iglice i poprowadziliśmy przewody odprowadzające po elewacji do miejsc przewidzianych pod złącza kontrolne. Przy pracach na wysokości korzystaliśmy z podnośnika. Dziękujemy SunRoof za zaufanie.

We installed a Solplanet 11 kW charger for an electric vehicle. As there was no spare space in the existing distribution board, we installed a new board with 2 rows of 12 modules. Its size was selected with the client's plans to install a second charger in the future in mind. The work was completed with electrical testing and a test report. **Scope of work:** - Installation of a Solplanet 11 kW EV charger. - Installation of a new distribution board with 2 rows of 12 modules. - Preparation of the distribution board for future expansion. - Electrical testing and preparation of a test report. A properly prepared installation and correctly selected protective devices are important for safe EV charging. Allowing for future expansion also helps avoid unnecessary alterations when extending the system.

We are carrying out a complete electrical and low-current installation in a new detached house in Chałupy. The scope includes electrical wiring, installation and fitting out of the distribution board, earthing and lightning protection, an intruder alarm and CCTV. We are also carrying out final fitting of accessories and fixtures, commissioning and acceptance testing. The work follows the design documentation and is supervised by an electrical works manager. The project is being carried out for ARKADIS Sp. z o.o. Scope of work: - electrical installation, - electrical distribution board, - earthing system, - lightning protection system, - intruder alarm system, - CCTV and cameras, - final fitting of accessories and fixtures, - testing and commissioning.

We have begun a comprehensive electrical installation upgrade in an operational Military Property Agency building at 3 Wschodnia Street in Kołobrzeg, which houses, among other facilities, a clinic and a pharmacy. The scope includes replacement and reconstruction of internal supply lines, upgrading distribution boards and electrical risers, and rebuilding and relocating 16 metering systems outside the building. The works will also include new cable routes and installation penetrations, earthing with a main earthing terminal, and upgraded electrical installations and lighting in the basement. As the building remains in use, the works are carried out in stages, with carefully organised switching and limited power interruptions. The project requires ongoing coordination with the Military Property Agency, the supervising inspector and ENERGA-OPERATOR.

Upgrade of the electrical installation for “Przystanek Historia”, including emergency and escape-route lighting. The project also included a smoke ventilation system for two stairwells, based on AFG control panels, with automatic activation in the event of a fire.

Replacement of the electrical installation in a flat in a tenement building on Pileckiego Street in Koszalin. The scope included new circuits, installation of a distribution board with protective devices and all final electrical fittings. We installed sockets, switches and lighting, including decorative bathroom lighting and a special LED luminaire designed for installation in the shower area.

Comprehensive earthworks for power cable routes and installation of lighting poles and fixtures in a car park.

Core drilling through an external wall for energy cable conduit — precise drilling while maintaining structural integrity.

Full electrical rewire of a listed school building combined with structured computer network installation — a project requiring special care for the historic fabric of the building.

The first stage of the electrical installation modernisation in a house built in 1906 in Sarbinowo. We removed the old fuse board with cartridge fuses and replaced it with a new main distribution board equipped with modern modular protective devices. Due to the age of the building and the condition of the existing wiring, the work required particular care and the systematic organisation of the existing circuits. The new distribution board was prepared for the next stage of the project: a comprehensive replacement of the entire electrical installation in the building.

Complete installation of a lightning protection system on a 35 m² modular house. The scope included horizontal and vertical air-termination conductors, down conductors and connection of the system to the earthing arrangement. After completion, measurements were carried out and a test report was prepared to confirm that the system had been installed correctly.

Preparation of cable routes and wiring for the intrusion alarm (SSWiN) and CCTV monitoring system at a SCANIA facility.

Comprehensive modernisation of the electrical installation in a multi-family residential building on Spółdzielcza Street in Koszalin. The scope included replacement of the internal power supply lines (WLZ), all meter and common-area distribution boxes, the doorbell installation and modernisation of the stairwell lighting. We also installed a fire safety main switch (PWP). After completion, the installation was tested and prepared for safe operation.

Installation of a 9 kWp photovoltaic system on the roof of a detached house. The system was designed with future expansion in mind: the inverter and cable routes were selected to allow the system capacity to be increased easily without reconstruction.

Modernisation of the electrical installation in a flat in a large-panel apartment block on Wańkowicza Street in Koszalin. The scope included replacing the kitchen wiring, installing additional circuits adapted to the new appliances and replacing the flat's distribution board. We also replaced the internal power supply line to the flat and converted the installation to three-phase power. The work required precise cable routing through exceptionally hard reinforced-concrete walls.

Installation of a new electrical system together with an intrusion alarm (SSWiN) and CCTV monitoring in a hair salon.